The first fix and the second fix
Our timber frame house in Hoole is now progressing rapidly. The timber frame itself was constructed on site in just three days. The exterior brick ‘skin’ has now been built, the roof is complete and the windows are in. Our tradespeople have been very busy over the last few weeks with the first and second fix, so all the plumbing and electrics have been installed and the plasterboarding is almost complete.
From California to Hoole
This couple’s self-build journey has been a particularly interesting one. Before commencing their self-build project they were in a long distance relationship, with Jenna working in the United States and Mark remaining in Cheshire so they only saw each other occasionally. The onset of Covid made meeting up at all impossible for eighteen months.
When Jenna returned to Chester, the couple were keen to find a home of their own in Hoole, where they had lived previously. This became more pressing as they were expecting their first baby and needed to find a suitable house, preferably with a garden and with off-road parking too. As anyone who knows Chester will testify, finding a home like this in Hoole was always going to be a tall order.
After failing to find an existing house, the couple started to consider building a home of their own. That way they could design it exactly to their own requirements. Building plots in Hoole are very few and far between, so they were thrilled to discover that CB Homes had a plot that could be perfect for their needs.
The property being built at Stone Place has parking space included at the front and bifold doors to the rear lead into outdoor space with room for a patio and lawned area, perfect for a young family.

Advice for self-builders: allow plenty of time to arrange a self-build mortgage
Mark says he was surprised by how long the process of securing a self build mortgage can take. He suggests allowing time for making more than one application as you never know what may happen. He says,
“When we made our first self-build mortgage application, mortgage providers suddenly started withdrawing lots of their products from the market. This left lots of people high and dry. We managed to secure another mortgage but it does take a lot of time.
“Luckily, the CB Homes finance team was really patient with us and very understanding of the delays we experienced, even though they were obviously very keen to get construction started. Just be aware that, unless you are paying in cash, you may need to factor in time for having at least one application rejected.”
Choosing designs for inside a self-build house: the second fix
This bespoke home is now at the second fix stage so the self-builders Mark and Jenna are making their final choices for the internal finishes.
The self-builders want the interior to fit in with the exterior so did not want to have everything looking very modern inside as this would not look right with the neo-Georgian style of the outside of the house.

The kitchen is almost complete. Mark and Jenna have chosen a beautiful design with Shaker style units. Jenna wanted a very particular shade of green to tone with the brushed brass fixtures and wooden floor. As she could not find exactly what she wanted, she has opted for painted units to get just the right colour. The Belfast sink will add a traditional look, contrasting with the large modern American-style fridge freezer and the more contemporary breakfast bar, which will divide the dining area from the kitchen.

They have chosen a classic blue and white scheme in the family bathroom but have gone for more of a modern finish to the master bedroom ensuite.

Jenna says,
“If you have a real vision for what you want your house to look like inside, you may not be able to find exactly what you want but don’t let this worry you too much as there is always a compromise to be had to turn your dream into reality. For example, I combed the country and the internet for the right vanity units in the family bathroom and the master bedroom ensuite. I couldn’t find any that would fit the space but I did find someone who can build bespoke ones for me, which will be perfect.”

Be positive and plan ahead for second fix
Jenna also advises to start looking early for your finishing touches, although you may feel you are tempting fate to start your research too soon. She advises being positive and optimistic as a build can progress very rapidly and you need to have made your decisions early so that fixtures and fittings can be ordered. She says,
“I’ve been really surprised by how close to the original building schedule we have managed to keep. People often talk about interminable delays when you are building your own house but that hasn’t been our experience at all.
“One of the CB Homes project team is actually building his own house at the same time as us so we are enjoying comparing notes with him. We are so happy with how the build is progressing and we can’t wait to be back in Hoole.”


If you have always dreamed of building your own home, contact us to find out more about our complete turnkey solution for your self-build project.